Dongguan Superior Efnafræðileg Co., Ltd
+86-769-85156854
Hafðu samband við okkur
  • Múgur: +86-13360665063
  • Netfang: info@superiorcoating.net
  • Bæta við: 817 Shunsheng Bygging, Guowu 1. Vegur, Humen Bær, Dongguan Borg, Guangdong Hérað, Kína
[[smallImgAlt]]
video

Asphalt Modifier

The product is a permeable asphalt color paint with two-component acrylic resin as the main material, adding anti-skid agent, pigment, elastomer, solvent and other carefully processed production.

Hringdu í okkur
  • Lýsing

     

    Product Characteristics

     

    (1) Room temperature from the dry, smooth light, high elasticity.

    (2) With excellent adhesion, weather resistance, permeability, tenacity and wear resistance, good mechanical properties.

    (3) Considering the environmental protection issues, there is no need to add a diluent.

    (4) Because the car often passes through, add the curing agent to increase the wear-resistant type of the product.

    (5) The construction site is in the port, the environment is relatively humid, the product has added anti-skid agent, so that the product has anti-skid performance.

     

    Product Use

     

    Can be applicable to the parking lot, warehouse, conference room, hospital, airport corridor, stadium, auditorium, electronic instrument workshop, computer room, electronic, food parking lot, asphalt color change and other heavy objects rolling workshop and other field painting. It not only has good environmental protection significance, but also is a suitable coating for modern industrial workshop and public places.

     

    Recommended Construction Process

     

    1, The ground foundation is well handled, convex place with grinding machine grinding smooth, concave place with putty filling and grinding smooth.

    2, Blow the dust on the ground clean with a hair dryer.

    3, Spray the first time to change the color top paint, cover the original color of asphalt.

    4, Spray the second time to change the color top paint, so that the ground color looks more full, brighter gloss

     

    Construction Points

     

    1. After asphalt color finish paint cover to stir evenly (with mixer mixing 5 minutes)

    2. After the paint mixing first, then into the curing agent mixing evenly (with mixer for 5 minutes)

    3. The paint mixing ratio: paint: curing agent =10:1

    4. When construction pay attention not to mix other kinds of paint, solvent, pay attention to keep rolling coating environment clean.

    5. It should not rain before and after the construction, and the road should be cleaned to ensure that the road is dry and evenly mixed, and the air spraying machine can be sprayed on the road requiring construction. After spraying and drying to traffic (24 hours).

    6. After use, the remaining paint and thinner should be sealed separately to prevent moisture absorption.

    7. Storage method: store in a closed place in a cool and dry place.

    8. Expiry date: 12 months

     

    A Schematic Diagram Of The Construction Structure

    Disposal of ground foundation

    The ground dust is treated clean

    Surrounding, color separation area paste good beautiful grain paper

    Spray the color paint for the first time

    After the first spraying, dry for 3-6 hours

    Spray the second paint

    Dry the second color paint for 3-6 hours

    Stick the beautiful grain paper in the underlined area

    The last line

    Technical Parameters

    Item times

    Surveillance project

    Unit symbol

    Criterion of detection

    Detection result

    1

    Status in the container

    ......
    ......

    Stir well without hard blocks

    conform to

    2

    Solid content (after mixing)

    %
    %

    ≥60
    ≥60

    64.2
    64.2

    3

    Drying time

    H
    h

    Table stem 4, hard work 24

    Table stem 2, work 8

    4

    Flexibility

    Mm
    mm

    ≤2
    ≤2

    2
    2

    5

    Adhesion

    Level

    ≤1
    ≤1

    1
    1

    6

    Abrasion performance

    G
    g

    ≤0.060
    ≤0.060

    0.035
    0.035

    7

    Resistance to shock

    Cm
    cm

    50
    50

    50
    50

    8

    Pencil hardness (scratch)

    ......
    ......

    ≥H
    ≥H

    H
    H

    Note: For a more specific test report, please contact the technician

     

    After-Sales Service

     

    Our company has an experienced professional technical team, which can provide the corresponding construction plan according to the different requirements and actual situation of the owner; During the construction process, with technical problems, our company will do our best to provide technical support; after construction, we will deal with related problems.

     

    maq per Qat: asphalt modifier

(0/10)

clearall